6462 E Summit Cove-Interior Work Begins

 

Finally the day has arrived to start something other than framing. It feels like we have been stuck on framing forever. When our subs actually show up when they say they actually get a lot done. We had no idea our roofer was coming but one day showed up and all of this was happening. That's always exciting
Electrical is coming along. It's super interesting that we spent a ton of time figuring out where all the lights would be and the switches for them would go and now the electricians are here and some of them just don't make sense so luckily we have been able to make some adjustments. There is a lot of wire going on in this box.
See all the plumbing...its coming along

And here is the HVAC stuff. With 4 furnaces there is a lot of duct that had to go in as well
Even fireplaces and tubs are in