Brett & Erin have always been terrible with projects but with their income they always end up with a fixer upper of a house. Erin found a deal on cabinets and had some people lined up to help but I really felt like we needed to go help. I talked to Matt and then called Erin to make a plan. We decided Easter weekend would be our best option. Thursday afternoon Kerry arrived to watch the kids and we headed to Logan. We wasted no time getting demo going.








By the end of the night we had all the demo done and had everything preped for Friday morning.
Matt and I headed back to our hotel that night. We showered quickly before passing out in bed. The next morning we had breakfast at the hotel before heading back to their house. We wasted no time getting going again. Erin and I took a load to the dump while Matt ran electrical and worked on the dry wall.



Erin and I grabbed lunch on our way back and after refueling Erin and I started the floor while Matt finished the electrical and drywall. I even patched some spots on the floor with new sub floor.



The floor went in pretty quickly and we decided once the floor was done we would break and go out for dinner
Pizza Pie cafe was a hit and just what we needed to refuel. Then we called it a night before our last day
Saturday we were all pretty tired to start but we were determined to finish.

The electrical ended up being a bigger problem than anticipated so we didn't get the appliances back in but everything else was pretty much wrapped up.







It was an exhausting weekend but we were happy we got to help although I don't know that we will do it again though.