I feel like the theme with the house this week is wires and tubes. Although the house isn't looking much different from the outside the inside is taking shape more all the time. This week the electricians have made great strides in completing the electrical. Ben has also completed most of the plumbing although they installed the wrong tub(oval instead of rectangular) so they will be back next week to finish and change out the tubs.

Girls upstairs bedrooms


On Monday they installed all the basement windows and Matt and Cameron(from work) were able to put in a couple of the upstairs windows as well
All the doors were delivered and will be put in the first part of next week
The timber trusses are both in and are just awaiting sheeting. We decided to hire out some of the basement framing, the remainder of the roof sheeting, and all of the blocking in an effort to get done and take some stress off of Matt's shoulders.

Each week things seem to get more stressful. I think its because Matt is working crazy hours and I am alone a lot. Im ready for this stage to be done. I love that we are getting to the point that we will start picking "fun" stuff. The smell of fall is in the air so we better get this house dried in and ready for the snow.